Excluded occupier
An excluded occupier is someone who has limited rights to remain in a residential building, for example, a tenant who shares accommodation with the landlord, or who lives in the same building as the landlord while sharing accommodation with a member of the landlord’s family. The Protection from Eviction Act 1977 states that, in this context, accommodation refers to any room (i.e. living room, bathroom, kitchen), but not ancillary areas such as storage, hallways, stairways, and so on.
The landlord is not obliged to provide an excluded occupier with a contract, although it is still recommended that there is a written agreement setting out the rights and responsibilities of both parties.
The tenant must give reasonable notice to the landlord before leaving the property, typically at least seven days. If it is a fixed-term agreement, notice to leave cannot be given before the fixed term ends unless a clause in the agreement allows for this, or if both parties agree.
If the landlord wishes to evict an excluded occupier, they need only provide ‘reasonable notice to quit’. What is deemed ‘reasonable notice’ can depend on the length of time that the tenant has lived there, how often they pay rent, how quickly another tenant is required to move in by the landlord, and so on.
If the tenant refuses to leave after this notice period, an application to a court is not required, the landlord can simply change the locks on the tenant’s rooms. (The landlord must, however, give the tenant their possessions.)
An excluded occupier can also refer to the following:
- Someone who lives in a hostel that is council or housing association-run.
- Someone who does not pay any rent.
- A trespasser or squatter who is allowed to stay temporarily.
- A tenancy or licence granted to provide accommodation as asylum.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.